大连船舶重工集团有限公司-凯发平台

s 大连船舶重工集团有限公司-凯发平台
凯发平台-凯发app平台 / english
 
home >  news center >  corporatenews

the 210000dwt bulk carrier built for norwegian shipowner set sail

 

 

 

on the morning of april 29, "golden saint"(bc2100-17), the 210,000dwt bulk carrier, built for frontline company of norway seatankers co. was signed for delivery by bohai shipbuilding heavy industry co. (bsic) of dsic. the delivery of this ship is not only the first one of bsic after the resumption of work and production, but also the fourth plan node realized on schedule in april, with the realization rate of chronological plan reaching 100%. dutt, chief resident representative of the shipowner, wang yupeng, resident surveyor of abs, yang shuzhen, leader of dsic, attended the signing and delivery ceremony, and mr. zhang licong of csoc participated in the ceremony through "cloud signing".

 

frontline company is a regular customer of bsic. the cooperation between the two sides started in 2013. the "golden saint" ship delivered this time was independently designed by bsic, and delivered as the first ship in four 210000dwt bulk ships extended built for frontline company. the ship is 300 meters long, 49 meters wide and 25.3 meters deep. it is classified into abs.

 

in the face of the unexpected epidemic, with the help of ministry of industry and information technology, cssc, dsic, bsic has made a scientific analysis of the situation and the potential, and grasped the crisis and opportunity dialectically. the production and business operation departments have taken the initiative to act independently. while strictly implementing the epidemic prevention and control instructions at all levels, they also carefully schemed the delivery plan.

 

bsic has made great efforts to overcome the adverse impacts brought by the epidemic, practically achieved the two goals of epidemic prevention and control and production and operation, interpreted the mission responsibility of the main force for epidemic prevention and control of state-owned enterprises and the national team to resume work and production with professionalism and perseverance, and further achieved the annual production and operation targets in an all-round way.

 

 

address: 1 yanhai street, dalian, liaoning province, china(to browse the contents, use ie6.0 or above)
凯发平台 copyright@2005 dsic.cn all rights reserved
tel: 86-411-84482888 fax: 86-411-82633461 e-mail: dsic@dsic.cn
辽icp备06004983号 technical support: shipol
网站地图